Ayhan, M, Dikmen, I and Talat Birgonul, M (2021) Predicting the Occurrence of Construction Disputes Using Machine Learning Techniques. Journal of Construction Engineering and Management, 147(04).

Bhandari, S, Hallowell, M R, Alruqi, W and Salas, R (2021) Modeling the Relationship between Personal Risk Tolerance, Work-Related Risk Tolerance, and Risk-Taking Behavior of Construction Workers. Journal of Construction Engineering and Management, 147(04).

Elsayegh, A and El-adaway, I H (2021) Holistic Study and Analysis of Factors Affecting Collaborative Planning in Construction. Journal of Construction Engineering and Management, 147(04).

Garcia, G, Golparvar-Fard, M, de la Garza, J M and Fischer, M (2021) Measuring Progress and Productivity in Model-Driven Engineering for Capital Project Delivery. Journal of Construction Engineering and Management, 147(04).

Hasan, M and Lu, M (2021) Error Propagation Model for Analyzing Project Labor Cost Budget Risks in Industrial Construction. Journal of Construction Engineering and Management, 147(04).

Herrera, R F, Mourgues, C, Alarcón, L F and Pellicer, E (2021) Analyzing the Association between Lean Design Management Practices and BIM Uses in the Design of Construction Projects. Journal of Construction Engineering and Management, 147(04).

Jia, B, Yang, Y, Xie, B and Yu, X (2021) Novel Geometric Control Technology for Precast Segmental Bridges. Journal of Construction Engineering and Management, 147(04).

  • Type: Journal Article
  • Keywords: Bridge; Segmental precast; Accelerated bridge construction; Short-line match method (SLMM); Geometry control;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002006
  • Abstract:
    The short-line match method (SLMM) is an effective and popular technology for accelerated bridge construction because it is characterized by a small construction area, minimal labor, and fast construction speed. However, a millimeter-sized error in the precast phase may be amplified to a meter-sized error at the end; therefore, SLMM has an extremely high requirement for geometric control. Construction project abandonment and rework accidents caused by geometric control failure frequently occur. Existing geometric control methods should be improved due to their incomplete consideration of geometric errors. This study presents a novel high-precision geometric control method (HPGCM) for SLMM. The proposed method includes the decoupling of deviation angles consisting of coupled components from different planes and the identification of deviation angles with different spatial positions. The effectiveness of the proposed method is verified through simulated and practical examples. The developed method exhibits high precision and reliable error-correcting ability. It can provide a reference for the construction of SLMM-based bridges in the future.

Kar, S, Kothari, C and Jha, K N (2021) Developing an Optimum Material Procurement Schedule by Integrating Construction Program and Budget Using NSGA-II. Journal of Construction Engineering and Management, 147(04).

Kineber, A F, Othman, I, Oke, A E, Chileshe, N and Buniya, M K (2021) Impact of Value Management on Building Projects Success: Structural Equation Modeling Approach. Journal of Construction Engineering and Management, 147(04).

Kula, B and Ergen, E (2021) Implementation of a BIM-FM Platform at an International Airport Project: Case Study. Journal of Construction Engineering and Management, 147(04).

Love, P E D, Matthews, J and Fang, W (2021) Reflections on the Risk and Uncertainty of Rework in Construction. Journal of Construction Engineering and Management, 147(04).

Makul, N (2021) Modified Cost-Benefit Analysis of the Production of Ready-Mixed Self-Consolidating Concrete Prepared with a Recycled Concrete Aggregate. Journal of Construction Engineering and Management, 147(04).

Martin, H and Ramjarrie, K (2021) Cloud Contractor Selection Model for Design-Build Open Tender. Journal of Construction Engineering and Management, 147(04).

Murguia, D, Demian, P and Soetanto, R (2021) Systemic BIM Adoption: A Multilevel Perspective. Journal of Construction Engineering and Management, 147(04).

Nguyen, L D and Tran, D Q (2021) Measurement of Fuzzy Membership Functions in Construction Risk Assessment. Journal of Construction Engineering and Management, 147(04).

Rastegar, H, Arbab Shirani, B, Mirmohammadi, S H and Akhondi Bajegani, E (2021) Stochastic Programming Model for Bidding Price Decision in Construction Projects. Journal of Construction Engineering and Management, 147(04).

Sherman, R, Parrish, K and Lamanna, A (2021) Identifying and Categorizing Risks Incumbent in US Nuclear Power Plant Construction. Journal of Construction Engineering and Management, 147(04).

Somboonpisan, J and Limsawasd, C (2021) Environmental Weight for Bid Evaluation to Promote Sustainability in Highway Construction Projects. Journal of Construction Engineering and Management, 147(04).

Tariq, S and Zhang, X (2021) Critical Analysis of the Private Sector Roles in Water PPP Failures. Journal of Construction Engineering and Management, 147(04).

Ugural, M and Giritli, H (2021) Three-Way Interaction Model for Turnover Intention of Construction Professionals: Some Evidence from Turkey. Journal of Construction Engineering and Management, 147(04).

Wang, Z, Liu, Y, Hu, H and Dai, L (2021) Hybrid Rescheduling Optimization Model under Disruptions in Precast Production Considering Real-World Environment. Journal of Construction Engineering and Management, 147(04).

Xia, N, Tang, Y, Li, D and Pan, A (2021) Safety Behavior among Construction Workers: Influences of Personality and Leadership. Journal of Construction Engineering and Management, 147(04).

Zheng, J, Zhang, Z, Wu, G, Yang, Y, Xia, N and Liu, B (2021) Daily Self-Efficacy, Work Engagement, and Deviance Behavior among Construction Professionals and Workers: Cross-Level Moderating Role of Job Control. Journal of Construction Engineering and Management, 147(04).